Water

2022 Water Quality Report CCR

 

Pay your water bill online, just click below                                   

BS&A Online website

 

$5.00 Bill Credit Flyer Click Here

 

Frenchtown Lead and Copper Excavation

The Water Department has been out spot checking water services to verify records for our Lead and Copper compliance. The homes are randomly generated to cover the whole Township. We will be digging at the curb box located at the property line.  We will verify the material and fill the hole created with sand temporarily. We will return to fill the hole with Top Soil and hydroseed the damage area. We are hoping to use the hydro excavator to create as little damage to the lawn as possible. Thank you for you cooperation during this time.

 

Frenchtown Water Bills Late Fee Waiver Expiring in 2021

If you are struggling to make your water bill payments, please call our office at 734-242-5902 ext.112. We have flexible options to help you make your payments. We want to work with you to get any past due charges paid down. Please feel free to inquire about you options.

 

FRENCHTOWN WATER IS SAFE TO DRINK

Frenchtown Water PFAS samples are well below the EPA Lifetime health advisory level. A press release was sent out to keep our customers informed on what is in your drinking water. Sample results will be posted here as they arrive.

Frenchtown Water PFAS Testing Results

Frenchtown Water Treatment PFAS Results

Frenchtown Water PFAS Press Release

PFAS Press Release 2019

PFAS Educational Information: Understanding What PFAS are all about.

PFAS_in_Drinking_Water_624844_7 PFAS Fact Sheet

PFAS Fact Sheet

Frenchtown Water Full Page Billing

The Water Department has made the decision to start using full page water bills. We are hoping to have the process completed before our March billing cycle. So please look for the new full page bill.

Frenchtown Water Quality

Frenchtown is continuing to meet or exceed all State and Federal sampling requirements. Please feel free to call with any questions,

Water Treatment Plant

The Frenchtown Water Plant is a state of the art 8.0 Million Gallon Per Day (MGD) water treatment plant. The water plant consists of two different types of treatment technologies. The existing 4.0 MGD plant was put into operation in 1994 and is a conventional Claricone system, consisting of 2 Claricones and 4 Rapid Sand Filters. To meet the growing demand of water in the Township a 6.0 MGD Membrane Filter Treatment Plant was built. The plant was completed in 2006 and has some of the newest technology in the water treatment field. The plant has three 2 MGD Membrane filters, and includes a full SCADA system. With the addition of a new Ozone System and the membrane filter technology, we feel we are putting out some of highest quality of water in the state of Michigan.

The water treatment plants main goal is to provide safe, reliable, and aesthetically pleasing drinking water to the Township. We are proud that since the plant was put on line in 1994, we have never been in violation of federal or state drinking water standards.

Water Plant Distribution

The Frenchtown Water Departments Distribution crew handles 43 square mile of township area. We maintain all water meters, water mains and fire hydrants in house. The Distribution crew’s main objective is to provide adequate and safe water to the customers. Our crew responds to all of your service questions, water main and service breaks.

Comments are closed.